The construction of transport tunnels is one of the largest, most ambitious and most challenging types of infrastructure projects you can do, and every element from the tunnel boring machines to the vulcanisation services needs to be optimal in order to avoid potential delays. There are a lot of factors that can affect delivery, as […]
The design of the last visible part of the HS2 Chiltern Tunnel has been published. While most of the ten-mile-long tunnel will be disguised by being built into the landscape, one part of the North Portal will be able to be seen from a footbridge. It will be one of only seven structures of the […]
HS2 has begun work on a logistics tunnel under London with conveyor belt accessories, which will be used to deliver construction materials and remove waste.